Conrad council accepts water main loop bid
The Conrad city council accepted a $179,405 water main looping bid from Vieth Construction of Cedar Falls during its regular meeting last Thursday night.
The city received two bids total (the other came from Hatch Grading and Contracting of Dysart), and the low bid came in well under the engineer’s estimate ($220,000). Vieth will install an eight-inch loop on the south side of town. After a brief public hearing, the council voted unanimously to accept the bid.
Councilman Todd Schnathorst reported that he recently met with a developer from the Waterloo-Cedar Falls area and had a productive conversation about the plans to develop lots on Main Street and Lillian on the north side of town across the street from the swimming pool. So far, estimates have pegged the total number of lots in the eventual development at anywhere between 26 and 40.
For the full story, see this week's Grundy Register. Subscribe by calling (319) 824-6958 or clicking here.
The Grundy Register
601 G. Avenue - P.O. Box 245
Grundy Center, IA 50638
Telephone: 1-319-824-6958
Fax: 1-800-340-0805
Mid-America Publishing
This newspaper is part of the Mid-America Publishing Family. Please visit www.midampublishing.com for more information.